Tugger Winch Motor Overhaul for 8050 Marion Dragline

Project Overview

We overhauled a tugger winch motor on an 8050 Marion Dragline to restore its performance and ensure reliability for continued mining operations at Sojitz.

Client Name

Sojitz

• Completion Timeframe

4 Weeks

Result
THE RESULTS

Restored Efficiency and Reliability in Just Four Weeks

After four weeks of meticulous work, the motor was restored to peak condition, improving the efficiency and reliability of the dragline, and preventing costly unplanned downtime.

THE PROBLEM

Preventing Unexpected Motor Failures in Critical Equipment

The motor was due for maintenance, and without timely intervention, there was a risk of unexpected breakdowns that could disrupt operations and affect safety.

Problem
THE SOLUTION

Comprehensive Motor Overhaul for Enhanced Performance

The motor underwent a full inspection, was electrically tested, baked to remove moisture, and coated with varnish for insulation. Afterward, it was fully repainted to protect against wear and corrosion, ensuring optimal performance and safety for future operations.

Solution 1
Solution 2
Projects

Delivering Results

Take a look at some of our recent projects and see how our expertise supports various industries.

MINING

Komatsu 830E Cabinet Overhauls

Recent Project

INDUSTRIAL

66/6.6kV Transformer Changeout

Recent Project

MINING

Tugger Winch Motor Overhaul for 8050 Marion Dragline

Recent Project

AGRICULTURE

Installation and Commissioning of 185kW Fylght Submersible Pump

Recent Project
CONTACT US

Have a Similar Project? Contact Us for a Quote

34 Batts St, Emerald QLD 4720

07 4982 0375

Family-Owned Expertise Servicing the Mining