Complete Power Technologies
INDUSTRIAL

66/6.6kV Transformer Changeout

Project Overview

The project involved replacing a 66/6.6kV transformer, a critical component in the power distribution system, to ensure continued stability and efficient operation for Sojitz Blue.

Client Name

Sojitz Blue

• Completion Timeframe

4 Days

THE RESULTS

Rapid Installation Ensuring Continuous Power Supply

With a swift completion time of just four days, the new transformer was fully installed and commissioned, ensuring uninterrupted power supply and reducing potential risks of failure.

THE PROBLEM

Avoiding Power Failures Due to Transformer Wear

The existing transformer showed increased wear, as indicated by the Dissolved Gas Analysis (DGA), signaling potential failure. This posed a risk of power outages, equipment damage, and costly downtime.

THE SOLUTION

Seamless Transformer Replacement for Uninterrupted Power

We successfully coordinated the procurement of a high-quality replacement transformer and managed the entire installation process from start to finish. This solution guarantees enhanced power distribution, improved performance, and long-term operational stability.

Projects

Delivering Results Across Central Queensland

Take a look at some of our recent projects and see how our expertise supports various industries.

MINING

Komatsu 830E Cabinet Overhauls

Komatsu 830E Cabinet Overhauls

INDUSTRIAL

66/6.6kV Transformer Changeout

66/6.6kV Transformer Changeout

MINING

Tugger Winch Motor Overhaul for 8050 Marion Dragline

Tugger Winch Motor Overhaul for 8050 Marion Dragline

AGRICULTURE

Installation and Commissioning of 185kW Fylght Submersible Pump

Installation and Commissioning of 185kW Fylght Submersible Pump
CONTACT US

Have a Similar Project? Contact Us for a Quote

34 Batts St, Emerald QLD 4720

+61 407 135 599

Family-Owned Expertise Servicing the Mining